The works mainly consists of joinery, renew handrails, remove and re-fix pin / white boards, refurbishment to several doors, black out works to numerous high level windows.
Removal and installation of suspended ceilings to numerous rooms.
Removal and renewal of floor coverings, Replace luminaries (free issue from University)
Full decoration throughout., in this laboratory there is live experiments that have been on-going for over 20 years, these had to be live for the duration of the contract.